Rabu, 16 Mei 2012

Dollar $$$ Dari Monitor PC/Laptop Anda


Justbeenpaid Tripler $$$


Justbeenpaid tripler $$$

            KETERANGAN JSS TRIPLER



Apa yang di tawarkan Program ini?

A) Perusahaan pada dasarnya menjual Paket Pelatihan Sukses

* Anggota Gratis menerima "Upgrade Otak Anda".

* Level 1 ($ 15Anggota menerima "Terobosan untuk Sukses Besar".

* Level 2 ($ 57) Anggota menerima Trik Sukses Mematikan!"

* Level 3 ($ 117) Anggota menerima "Trik Sukses Mematikan lanjutan!"

biaya tiap Keanggotaan berlaku selama 90 hariAnggota Level 1 juga mendapatkan posisi JBP gratis saat posisi Jss-Tripler mereka berakhir.
Angota Level 2 & 3 mendapatkan komisi upgrade referral 50bila anggota mereka juga meng-upgrade keTingkat 2-3.

BPerusahaan juga menjual Paket Iklan / Kredit bagi anggota untuk mempromosikan produk mereka sendirikepada anggota lain dalam program iniAda persyaratan yang harus dipenuhi bagi anggota per minggu dan menu withdraw (penarikan ) juga tersedia.

Bagaimana Member mendapatkan uang?

Pada dasarnyaJBP adalah program Berbagi PendapatanSaat iniada 3 cara di mana
anggota dapat mendapatkan keuntungan:

A) Jss-Tripler (diluncurkan pada Februari 2011)

Ini adalah program traffic di mana anggota bisa mendapatkan 2% per hari (hari kalenderselama 75 hariTotal pendapatan hingga 150dalam 75 hariSetelah 75 hariposisi akan
berakhir. Setiap posisi biaya hanya $ 10 masing-masing.

Anggota hanya boleh membeli posisi maksimum 25.000 atau senilai $ 250.000, maksimum pembelian 500posisi per hari..

BJBP's Synergy Surf (JSS) (diluncurkan pada Agustus 2010)

Posisi JSS-tripler yang kadaluarsa tersebut kemudian ditransfer ke JBP's Synergy Surf (JSS)dimana 4 posisi yang kedaluwarsa mendapatkan 1 posisi SLTP gratis atau matriks 2x2 yang menghasilakn $ 60 tiap pada saatsiklusEmpat dari posisi ini Tripler kadaluarsa senilai $ 40 secara total mendapatkan US $ 60 ketika siklusmatriks terjadi, dapat tambahan 150% lagi.
Lalu Apa Maksud Nama "Tripler"?

Untung 4 posisi (150%) + posisi Matriks (150%) = 300%.
Sebagai contoh, katakanlah bahwa Bob membeli 4 posisi Jss-Tripler sebesar $ 40Dia mendapatkan $ 60 setelah 75 hari atau 150%.
4 posisi kedaluwarsa tersebut kemudian ditransfer ke JBP’Surf Synergy untuk menciptakan 1 posisi Gratis di mana Bob akan mendapat $ 60 saat siklus terjadi. Jadi secara total,
Bob menempatkan modal sebesar $ 40 untuk mendapatkan $ 60 di Tripler + $ 60 di Jbp’Surf Sinergi = $ 120, demikian, tiga kali lipat modal awal! Berapa lama waktu yang dibutuhkan untuk siklus matriks? Hal ini bisa per minggu atau beberapa bulan tergantung pada strategi yang digunakan oleh anggota untuk membantu siklus.

Jumlah maksimum posisi JBP’ Sinergy Surf yang boleh dibeli anggota saat ini adalah 5.000 dan mereka bisa membeli hingga 100 posisi per sehari. Tidak ada batasan jumlah posisi yang dapat ditambahkan ke rekening anggota karena partisipasi mereka dalam Jss-Tripler.

C) Komisi Referral

Meskipun tidak ada kewajiban untuk mengajak orang untuk memperoleh penghasilan di JBP, tapi bila mensponsori orang lain anda dapat:

1. Dapatkan 10% Level 1 dan 5% di LEVEL 2 untuk setiap posisi Jss-Tripler yang mereka beli. Saat ini, komisi tertinggi  yang bisa diperoleh adalah $ 500 per hari untuk referensi di Level 1 dan $ 250 per hari untuk Level 2.

2. Dalam Jbp’Surf Sinergi, ketika siklus matriks referral, sponsor menerima $ 5 Referral Bonus Level 1 dan Bonus Referral $ 2,50 di Level 2.

Bagaimana Perusahaan mendapatkan Uang?

Bagaimana perusahaan dapatkan  uang untuk tetap hidup ketika orang lain gagal?

Ada sejumlah cara:

1) Melalui upgrade keanggotaan.

2) Melalui posisi JSS yang dibeli di Surf Synergy.

3) Melalui pembelian Placement dalam posisi Jss.

4) Melalui pembelian upgrade penempatan.

5) Melalui penghapusan account anggota yang tidak aktif lagi

Pada prinsipnya, posisi Jss-Tripler adalah Kewajiban dan posisi JSS adalah Aset. Para anggota mendapatkan  uang di Jss-Tripler tetapi dalam JSS Surf Synergy, baik anggota maupun perusahaan sama-sam mendapatkan uang. Frederick telah menciptakan Terobosan Damm untuk hal ini. Damm singkatan “Double Asset Money Multiplier”
Prinsip ini didasarkan pada transaksi tunggal anggota membeli posisi JSS $ 20 yang menciptakan 2 aset tanpa kewajiban . Ini melanggar "Aturan akuntansi". Begitu anggota menerima posisinya, ia berdiri untuk menerima aset potensial senilai $ 60. Perusahaan JUGA menerima senilai aset potensial $ 20. Dibutuhkan $ 80 untuk mengisi semua tempat dalam matriks, apakah itu diisi oleh pemilik
matriks sendiri ketika berakhir posisi Jss-Tripler posisi atau spillover dari anggota lain dalam sistem.

Dengan kata lain, ketika sebuah siklus posisi JSS, menghasilkan $ 80 dimana $ 60 adalah dibayarkan kepada
anggota yang memiliki matriks dan $ 20 dibayarkan kepada perusahaan. Pada kenyataannya, BANYAK
siklus matriks sehari-hari, membuat kedua anggota dan perusahaan banyak uang secara teratur.

Apa Yang Terjadi Jika Arus Kas Ternyata Negatif?

Selama dana baru masuk dalam program oleh anggota biasa atau baru, perusahaan akan selalu memiliki cukup dana untuk membayar kepada anggota setiap hari. Dalam banyak program tradisional, sebagai program tumbuh, ada saatnya di mana uang masuk kurang dari jumlah yang akan dibayar harian, arus kas berbalik negatif. Bahaya lainnya adalah bahwa program ini menderita downtime server atau beberapa gangguan lainnya, menyebabkan hilangnya kepercayaan oleh anggotanya. Uang baru berhenti datang ke dalam program dan keos. Program ini kemudian runtuh.

Dalam kasus JSS, kewajiban hanya untuk membayar $ 60 saat matriks terisi. Tapi supaya terisi, $ 80 harus terjadi dulu seperti yang dijelaskan sebelumnya. Jika program keseluruhan melambat, anggota individu selalu dapat mensponsori orang untuk mengisi matriks dan mentriplekan uang mereka. Nasib keuangan mereka secara efektif di bawah kendali mereka sendiri.

Dalam kasus JSS, tidak ada insentif bagi pemilik program untuk "melarikan uang "Sebagaiman JSS tumbuh, jumlah posisi yang tidak cycle juga tumbuh, menciptakan akumulasi "aset $ 20" yang cenderung membayar lebih semakin lama program terus berlanjut. Untuk memastikan keberhasilan program berkesinambungan, Admin telah menciptakan apa yang disebut Fitur Restart (RSF) ketika titik jenuh terjadi, untuk memastikan arus kas tetap positif. Ketika kewajiban membayar Jss-Tripler itu menjadi sangat besar, itu diperlukan untuk "restart" itu sebagai sebuah program baru kembali.
"melarikan uang" atau mematikan program hanya akan menhancurkan sendiri asset yang telah lama di bangun
Fitur Restart

Juga dikenal sebagai JSS-Tripler Restart, itu adalah konversi dari beberapa Posisi Jss-Tripler ke posisi JSS. Ada penurunan sementara pendapatan Tripler karena konversi ini. KECUALI untuk account baru. Yang mendaftar "10-25"hari kebelakang, Restart tidak akan berlaku. Hal ini menghilangkan rasa takut bahwa Anda tidak dapat mempromosikan untuk anggota baru karena akan terjadi restart.

Dalam "situasi normal", sebuah Restart lengkap mungkin harus dilakukan. Sebuah contoh apabila pihak  prosesor pembayaran membekukan account kita dan mencuri dana kita. Sebuah Restart lengkap akan mengkonversi SEMUA Posisi JSS-Tripler ke Posisi JSS. JSS-Tripler kemudian dapat restart dengan prosesor pembayaran yang berbeda.
Anggota tetap dapat semua posisi JSS mereka dan dapat terus produktif dari posisi tersebut (Sebagian besar anggota juga kemungkinan besar akan dapat memulihkan dana dari pembayaran "buruk" prosesor) Untuk memahami secara detail bagaimana anggota dapat mendapatkan  banyak uang setelah restart!

silakan baca: http://www.justbeenpaid.com/faqs/restart.php

Tidak perlu takut Restart. Pendapatan Tripler mungkin berkurang  sementara tetapi merupakan fitur yang diperlukan untuk mempertahankan pendapatan setiap orang agar tetap produktif untuk tahun-tahun mendatang!
Additional Links/Reading Material
JBP Blog  www.justbeenpaid.com
Alexa Rating http://www.alexa.com/data/details/traffic_details?url=www.justbeenpaid.com
Placements & Cycling JSS Positions http://www.justbeenpaid.com/faqs/placement.php

MARKETING & TRAINING
                         http://marketing.justbeenpaid.com/


Sumber Penghasilan JSS-Tripler


Berikut adalah Sumber Penghasilan JSS-Tripler: 

1. JBP Admin’s Jss-Tripler account.
2. Advertising Sales.
3. JBP1 (The Big Success Breakthrough)
4. JBP2 (Killer Success Tricks)
5. JBP3 (More Killer Success Tricks)
6. JSS-Warp
7. JSS-Booster
8. JBP’s Synergy Surf (JSS)
9. Sale Of Referrals
10. Other income stream to be developed (Including “Project Certo Power)
The JustBeenPaid! program is one of the simplest programs available anywhere on the internet. 
Jadi Tunggu Apa Lagi?
SEGERA DAFTAR di Peluang Bisnis Dahsyat
Dengan Potensi PROFIT yang Luar Biasa!
Investasikan Sebagian Kecil Uang Anda BUKAN SEMUA!
Bergabunglah Bersama Tim Sukses Kami! 
JustBeenPaid.com menyediakan Platform untuk Kita Sukses Bersama



Langkah Transaksi DI Member area Justbeenpaid



Langkah Transaksi DI Member area Justbeenpaid




01.Cara Mendaftar Liberty reserve
▬►https://www.libertyreserve.com/

02.Cara mendaftar Tokochanger/exchanger resmi lainnya
▬►http://tokochanger.com

03. Cara Membeli Posisi ( Saham ) di JSS Tripler
▬► http://jsstripler.in/buy.php

04. Cara Mengetahui Penghasilan Harian Anda
▬► http://jsstripler.in/earning.php

05.Cara Memaksimalkan Profit di JSS Triple
▬► http://jsstripler.in/coumpond.php

06. Cara Upgrade di Just Been Paid
▬► http://jsstripler.in/upgrade.php

07. Cara Withdraw dari JSS Tripler
▬► http://jsstripler.in/withdraw.php

08. Interview Dengan frederick Mann
▬► http://jsstripler.in/interview.php

09. Request Website Support
▬► http://jsstripler.in/form.php
10.Tentang Matrix
▬► http://jsstripler.in/matrix.php

11.Cara memproteksi akun gmail
▬► http://jsstripler.in/protect_gmail.php

12.Pengenalan/Panduan lengkap Member area Justbeenpaid
 ▬► http://jsstripler.in/pengenalan-member-area.php

13. berbicara langsung denganOWNER perusahaan Justbeenpaid Mr.freederickman
▬►http://live.meetcheap.com/conference,jbpdailyconferenceroom



 14.Daftar justbeenpaid di
▬►
http://www.justbeenpaid.com/join.cgi?r=R3dZiTuZSW

PROBLEM UTAMA DIRECTIONAL DRILLING SERTA PENANGGULANGANNYA


PROBLEM UTAMA DIRECTIONAL DRILLING SERTA PENANGGULANGANNYA



Sasaran pemboran horizontal adalah membuat lubang horizontal dengan pertambahan sudut tertentu dari titik belok pertama. Masalah utama timbul karena adanya bagian pertambahan sudut dari bagian horizontal, yang berhubungan dengan efek gravitasi, friksi dan pengendapan partikel (cutting) pemboran. Masalah-masalah dalam pemboran horizontal diantaranya :
1)   Problem terhadap rangkaian, yaitu torsi, drag, buckling dan tension.
2) Problem lumpur dan hidrolika, yaitu pengendapan cutting dan gugurnya dinding lubang sumur.
3)   Kecenderungan penyimpangan sudut.
4)   Rendahnya laju penembusan.
5)   Differential pipe sticking.

Perencanaan rangkaian pipa bor yang akan dipergunakan harus mempertimbangkan beban drag, beban torsi, buckling, dan tension. Dalam hal ini yang akan kita bicarakan adalah masalah kekuatan dan beban dari rangkaian pipa bor.


Pembelokan lubang bor dalam pemboran horizontal dilakukan dengan besar sudut kemiringan dan arah tertentu sesuai dengan type pemboran horizontal yang dipilih. Pembelokan lubang bor dimulai dari KOP hingga target arah yang diinginkan (EOC/End Of Curvature), pembelokan arah diusahakan agar tidak mengalami penyimpangan terhadap rencana/ target, yang saat ini dikontrol melalui peralatan Measurement While Drilling (MWD).




selanjutnya download disini...

DRILL STRING COMPONENT


DRILL STRING COMPONENT



drill string on an drilling rig is a column, or string, of drill pipe that transmits drilling fluid(via the mud pumps) and rotational power (via the kelly drive or top drive) to the drill bit. The term is loosely applied as the assembled collection of the drill pipe, drill collars, tools and drill bit. The drill string is hollow so that drilling fluid can be pumped down through it and circulated back up the annulus (void between the drill string and the formation).
Drill string components
The drill string is typically made up of 4 sections:
  • Bottom hole assembly (BHA)
  • Transition pipe, which is often heavyweight drill pipe (HWDP)
  • Drill pipe
  • Drill stem subs
Each section is made up of several components, joined together using special threaded connections known as tool joints.
Bottom hole assembly (BHA)
The BHA is made up of a drill bit which is used to break-up the rock formationsdrill collarswhich are heavy, thick-walled tubulars used to apply weight to the drill bit, and stabilizerswhich keep the drilling assembly centered in the hole. The BHA may also contain other components such as a downhole motor, Rotary Steerable System, measurement while drilling(MWD), and logging while drilling (LWD) tools.
Transition pipe
Heavyweight drill pipe (HWDP) is used to make the transition between the drill collars and drill pipe. The function of the HWDP is to provide a flexible transition between the drill collars and the drill pipe. This helps to reduce the number of fatigue failures seen directly above the BHA. A secondary use of HWDP is to add additional weight to the drill bit.
Drill pipe
Drill pipe makes up the majority of a drill string. A drill string is typically about 15,000 feet (4.6 km) long for an oil or gas well vertically drilled onshore in the United States and may extend to over 30,000 feet (9.1 km) for an offshore deviated (non-vertical) well.
Drill stem subs
Drill stem subs are used to connect drill string elements.
Running a drill string
Most components in a drill string are manufactured in 31 foot lengths (range 2) although they can also be manufactured in 45 foot lengths (range 3). Each 31 foot component is referred to as a joint. Typically 2, 3 or 4 joints are joined together to make a stand.
Pulling the drill string out of or running the drill string into the hole is referred to as tripping. Drill pipe, HWDP and collars are typically tripped in stands to save time.
Stuck drill string
A stuck drill string can be caused by many situations.
  • Packing-off due to cuttings settling back into the wellbore when circulation is stopped.
  • Differentially when the formation pressure is too low, the wellbore pressure is too high or both, essentially pushing the pipe onto the wall of the wellbore.
  • Keyhole sticking occurs mechanically as a result of pulling up into doglegs when tripping.
  • Adhesion due to not moving it for a significant amount of time.
Once the tubular member is stuck, there are many techniques used to extract the pipe. The tools and expertise are normally supplied by an oilfield service company. Two popular tools and techniques are the oilfield jar and the surface resonant vibrator. Below is a history of these tools along with how they operate.
History of Jars
The mechanical success of cable tool drilling has greatly depended on a device called jars, invented by a spring pole driller, William Morris, in the salt well days of the 1830's. Little is known about Morris except for his invention and that he listed Kanawha County (now in West Virginia) as his address. Morris patented this unique tool in 1841 for artesian well drilling. Later, using jars, the cable tool system was able to efficiently meet the demands of drilling wells for oil.
The jars were improved over time, especially at the hands of the oil drillers, and reached the most useful and workable design by the 1870's, due to another patent in 1868 by Edward Guillod of Titusville, Pennsylvania, which addressed the use of steel on the jars' surfaces that were subject to the greatest wear. Many years later, in the 1930's, very strong steel alloy jars were made.
A set of jars consisted of two interlocking links which could telescope. In 1880 they had a play of about 13 inches such that the upper link could be lifted 13 inches before the lower link was engaged. This engagement occurred when the cross-heads came together.Today, there are two primary types, hydraulic and mechanical jars. While their respective designs are quite different, their operation is similar. Energy is stored in the drillstring and suddenly released by the jar when it fires. Jars can be designed to strike up, down, or both. In the case of jarring up above a stuck bottomhole assembly, the driller slowly pulls up on the drillstring but the BHA does not move. Since the top of the drillstring is moving up, this means that the drillstring itself is stretching and storing energy. When the jars reach their firing point, they suddenly allow one section of the jar to move axially relative to a second, being pulled up rapidly in much the same way that one end of a stretched spring moves when released. After a few inches of movement, this moving section slams into a steel shoulder, imparting an impact load.
In addition to the mechanical and hydraulic versions, jars are classified as drilling jars or fishing jars. The operation of the two types is similar, and both deliver approximately the same impact blow, but the drilling jar is built such that it can better withstand the rotary and vibrational loading associated with drilling. Jars are designed to be reset by simple string manipulation and are capable of repeated operation or firing before being recovered from the well. Jarring effectiveness is determined by how rapidly you can impact weight into the jars. When jarring without a compounder or accelerator you rely only on pipe stretch to lift the drill collars upwards after the jar releases to create the upwards impact in the jar. This accelerated upward movement will often be reduced by the friction of the working string along the sides of the well bore, reducing the speed of upwards movement of the drill collars which impact into the jar. At shallow depths jar impact is not achieved because of lack of pipe stretch in the working string.
When pipe stretch alone cannot provide enough energy to free a fish, compounders or accelerators are used. Compounders or accelerators are energized when you over pull on the working string and compress a compressible fluid through a few feet of stroke distance and at the same time activate the fishing jar. When the fishing jar releases the stored energy in the compounder/acclerator lifts the drill collars upwards at a high rate of speed creating a high impact in the jar.
System Dynamics of Jars
Jars rely on the principle of stretching a pipe to build elastic potential energy such that when the jar trips it relies on the masses of the drill pipe and collars to gain velocity and subsequently strike the anvil section of jar. This impact results in a force, or blow, which is converted into energy.
History of Surface Resonant Vibrators
The concept of using vibration to free stuck objects from a wellbore originated in the 1940's, and probably stemmed from the 1930's use of vibration to drive piling in the Soviet Union. The early use of vibration for driving and extracting piles was confined to low frequency operation; that is, frequencies less than the fundamental resonant frequency of the system and consequently, although effective, the process was only an improvement on conventional hammer equipment. Early patents and teaching attempted to explain the process and mechanism involved, but lacked a certain degree of sophistication. In 1961, A. G. Bodine obtained United States Patent 2,972,3801[1] that was to become the "mother patent" for oil field tubular extraction using sonic techniques. Mr. Bodine introduced the concept of resonantvibration that effectively eliminated the reactance portion of mechanical impedance, thus leading to the means of efficient sonic power transmission. Subsequently, Mr. Bodine obtained additional patents directed to more focused applications of the technology.
The first published work on this technique was outlined in a 1987 Society of Petroleum Engineers (SPE) paper presented at the International Association of Drilling Contractors in Dallas, Texas [2] detailing the nature of the work and the operational results that were achieved. The cited work involving liner, tubing, and drill pipe extraction and was very successful. Reference Two[3] presented at the Society of Petroleum Engineers Annual Technical Conference and Exhibition in Aneheim, Ca, November, 2007 explains the resonantvibration theory in more detail as well as its use in extracting long lengths of mud stuck tubulars. The Figure 1 below shows the components of a typical surface resonant vibrator.
System Dynamics of Surface Resonant Vibrators
Surface Resonant Vibrators rely on the principle of counter rotating eccentric weights to impart a sinusoidal harmonic motion from the surface into the work string at the surface. Reference Three (above) provides a full explanation of this technology. The frequency of rotation, and hence vibration of the pipe string, is tuned to the resonant frequency of the system. The system is defined as the surface resonant vibrator, pipe string, fish and retaining media. The resultant forces imparted to the fish is based on the following logic:
  • The delivery forces from the surface are a result of the static overpull force from the rig, plus the dynamic force component of the rotating eccentric weights
  • Depending on the static overpull force component, the resultant force at the fish can be either tension or compression due to the sinusoidal force wave component from the oscillator
  • Initially during startup of a vibrator, some force is necessary to lift and lower the entire load mass of the system. When the vibrator tunes to the resonant frequency of the system, the reactive load impedance cancels out to zero by virtue of the inductance reactance (mass of the system) equalling the compliance or stiffness reactance (elasticity of the tubular). The remaining impedance of the system, known as the resistive load impedance, is what is retaining the stuck pipe.
  • During resonant vibration, a longitudinal sine wave travels down the pipe to the fish with an attendant pipe mass that is equal to a quarter wavelength of the resonantvibrating frequency.
  • A phenomenon known as fluidization of soil grains takes place during resonantvibration whereby the granular material constraining the stuck pipe is transformed into a fluidic state that offers little resistance to movement of bodies through the media. In effect, it takes on the characteristics and properties of a liquid.
  • During pipe vibration, Dilation and Contraction of the pipe body, known as Poisson’s ratio, takes place such that that when the stuck pipe is subjected to axial strain due to stretching, its diameter will contract. Similarly, when the length of pipe is compressed, its diameter will expand. Since a length of pipe undergoing vibration experiences alternate tensile and compressive forces as waves along its longitudinal axis (and therefore longitudinal strains), its diameter will expand and contract in unison with the applied tensile and compressive waves. This means that for alternate moments during avibration cycle the pipe may actually be physically free of its bond.
  •  
re-post : http://top-topics.thefullwiki.org/Petroleum_geology

DOWNHOLE SCALE SQUEEZE TREATMENT


DOWNHOLE SCALE SQUEEZE TREATMENT



Masalah scale dapat menjadi salah satu penyebab menurunnya fluida produksi, hal ini karena scale yang terendapkan dapat memperkecil porositas dan permeabilitas batuan (formasi) produktif, disamping itu dapat juga mengganggu peralatan produksi dimana scale terendapkan dirangkaian itu.
Untuk alasan ini masalah scale harus dicegah dengan metode DSST. Apabila scale sudah terlanjur terbentuk, maka scale harus dibersihkan dulu dengan metode Acidizing.
Scale adalah endapan mineral yang terproduksi bersama air formasi yang karena reaksi kimia dan kondisi lingkungan yang mendukung, maka scale terendapkan. 

A. Tempat Pengendapan Scale
  • Formasi produktif
  • Zona perforasi
  • Peralatan produksi bawah permukaan : gravel pack, screen liner, working barrel dan tubing produksi
  • Pipa alir di permukaan
  • Dan peralatan produksi lainnya

B. Kondisi Yang Mendukung Terjadinya Scale
  • Perubahan tekanan dan temperatur
  • Larutan lewat jenuh (supersaturated solution)
  • Terjadinya perubahan komposisi air formasi
  • Perubahan derajat keasaman (pH)
  • Bercampurnya air formasi dari lapisan yang berbeda

C. Kerugian Akibat Masalah Scale
  • Kerusakan formasi batuan disekitar lubang bor (kehilangan tekanan / potensi formasi)
  • Penurunan produksi
  • Kerusakan alat – alat produksi
  • Meningkatnya biaya produksi

Dasar dari mekanisme scale inhibitor yakni usaha pencegahan sedini mungkin akan terjadinya scale dengan cara menginjeksikan bahan kimia ke dalam sumur untuk mencegah terjadinya reaksi kimia antara ion dan kation yang bisa mengendap. Jenis – jenis Scale Inhibitor yang memiliki kemampuan mencegah terjadinya Scale :
  • Phospate ester
  • Polymers (polyacramides)
  • Phosphonates

D. Faktor yang sangat penting dalam pemilihan inhibitor, sbb ;
  • Harga bahan kimianya
  • Kestabilan inhibitor terhadap perubahan tekanan dan temperatur yang besar
  • Keefektifannya
  • Kompabilitas terhadap fluida produksi, fluida workover / routine service dan bahan kimia lain

KANDIDAT PEMILIHAN SUMUR
1. Indikator
  • Penurunan jumlah cairan terproduksi secara drastis dapat menjadi indikator utama dalam mengidentifikasi terjadinya scaling di dalam suatu sumur produksi
  • Terjadinya perubahan tekanan dan temperatur yang tidak stabil

Nilai Scaling Indeks / Saturation Indeks dari hari pertama pengukuran water analysis dengan menggunakan metode, sbb ;
  • Diagram Stiff-Davis
  • OKSCALE (Oddo-Thompson)
  • Scalesoft
Urutan prioritas suatu sumur untuk di DSST, berdasarkan klasifikasi :
  • Sumur baru vertikal expansion --> perlu WA
  • Sumur setelah di acidizing (Acid Job) --> tidak perlu WA
  • Sumur setelah “revise liner” --> tidak perlu WA
  • Sumur commingle --> perlu WA
  • Preventive --> perlu WA
  • Re-DSST --> tidak perlu WA, pakai WA yang lama dan tidak perlu dilampirkan.

2. Pekerjaan Pendahuluan
  • Uji pH, jika pH < 6.5 tunda pekerjaan DSST
  • Uji Hardness (kandungan Ca dan Mg), jika Hardness > 300 ppm, tunda pekerjaan DSST
  • Check sumur dan lokasi, jika lokasi jelek, informasikan ke pumper

3. Pekerjaan Utama
  • Konfirmasi ke pumper area untuk memastikan seluruh fasilitas permukaan siap dijalankan
  • Adakan pertemuan tentang keselamatan kerja dengan seluruh crew yang terlibat dalam pekerjaan
  • Periksa seluruh hubungan antar valve, pasangan (connection) dan choke kepala sumur
  • Set pompa, tanki dan lakukan running test dengan mensirkulasikan fluida yang ada di dalam tanki.
  • Matikan sumur
  • Buat larutan mula-mula dengan jalan mencampurkan air bersih dengan demulsifier untuk membersihkan formasi, injeksikan air tersebut melalui annulus tanpa melampaui tekanan rekah formasi (300 psi)
  • Buat larutan scale inhibitor dengan mencampurkan scale inhibitor dengan air bersih. Injeksikan seluruh larutan scale inhibitor tersebut melalui annulus tanpa melampaui tekanan rekah formasinya (300 psi)
  • Buat larutan spacer / pengatur jarak dan injeksikan seluruh spacer tadi secepat mungkin tanpa melampaui tekanan formasi
  • Campurkan air bersih dengan demulsifier untuk melarutkan overflush (pembilas) yang berfungsi untuk mendesak larutan scale inhibitor sejauh 4 – 6 feet masuk secara mendatar ke dalam formasi
  • Matikan sumur antara 18 – 24 jam. Test pH dan Hardness. Jika pH < 6.5 atau Hardness > 300 ppm, tunda dulu POP dan segera informasikan ke pumper atau team leader
  • Kemudian jalankan kembali sumur produksinya (POP, Put well On Production)
  • Monitor PRC dan lakukan analisa air secara periodik hingga nilai PRC mendekati harga 2.19 ppm (biasanya antara 12 – 16 bulan) dan lakukan DSST ulang untuk treatment berikutnya

4. Kendala di Lapangan  
  • Pompa yang digunakan kadang mengalami gangguan "masuk angin" sehingga pompa tidak bisa bekerja sebagaimana mestinya.
  • Adanya kebocoran disetiap persambungan pipa atau hose
  • Pada saat proses penginjeksian, fluida yang diinjeksikan keluar melalui cable submergible pump yang dikarenakan dougnut seal dalam kondisi kurang bagus
  • Jarak pengambilan air (biasanya dari Gathering Station) dari lokasi eksekusi yang terlalu jauh, sangat berpengaruh terhadap laju penginjeksian
  • Jika membutuhkan air yang banyak untuk digunakan sebagai campuran chemical kadang mengharuskan eksekutor menggunakan satu unit vacuum truck tambahan.